35 MW extension of the 35MW Power plant in Libreville Gabon

Component of the project includes the addition of 2 X17.5 MW duel fuel  engines capable of working with Natural Gas or Diesel fuel. The project Includes a complete substation and  90 KV power line to connect to the nearest  national grid substation. The second phase expected to begin in March 2011, and will be completed in  12 months . the power plant  expected  to be commissioned and handed over in April 2013. The project is part of a continued multilateral effort to enhance the energy sector in Gabon and specifically focuses on closing the remaining gaps in the distribution networks in and around the capitol city of Libreville.

Proven record

Libreville Power Plant demonstrates the outstanding ability of Telemenia to deliver a turn-key generation plants, as well as financing and project management. Telemenia has long experience from projects in Africa, South & Central America Asia and Europe. In Gabon, Telemenia has been present since 2009 as a leading EPC contractor, and has built highly efficient over 2000MW of power generating plants in over 55 countries.

Skip to content